Sereno en 2023
12/12

001051052055002000305108020510560080062*0030904220010510510520070030044*000508020510565350422VentilatorShower bath drain holeAdjuster(six points)VentilatorShower bath drain holeAdjuster (six points)Grating opening rangeGratingDrain pitFloor gradient 1:100Grating opening rangeDrain pitGratingDrain holeDrain holeMultiple drain holes will be required whenMultiple drain holes will be required when a single drain hole does not provide a single drain hole does not provide su■cient drainage capacity su■cient drainage capacityFloor gradient 1:100Hot-water supply pipeHot-water supplyHot-water supply051Water supplyWater supplyWater supply pipeWater supply pipePosition of power supply (100V AC)Position of power supply (100V AC)Hot-water supply pipeHot-water supplyHot-water supplyWater supplyWater supplyWater supply pipeWater supply pipePosition of power supply (100V AC)Position of power supply (100V AC)1835-7,Miyoshi,Naka-ku,Okayama-shi,OKAYAMA 703-8261 JAPANKasumigaseki Building 4F, 3-2-5,Kasumigaseki,Chiyoda-ku,TOKYO 100-6004 JAPAN77,Mukoyama,Oku-cho,Setouchi-shi,OKAYAMA 701-4233 JAPAN Head OfficeTokyo Head Office Oku FactoryThe colors in this brochure may not necessarily be the same as in the actual model due to printing conditions.Speci■cations and appearance are subject to change for improvement without noti■cation.The content of this catalog is current as of April, 2023.Installation environment requirementsInstallation worksHot water / water supplypipingSize ... 20 A, water shuto■ valve. Raise from ■oor ... 100 mmHot water / water supply pressure ... 150–300 kPa Hot water/water supply ■ow ... At least 30 L/min for bothHot water temperature ... 60–70°C (at the point where it reaches the bathing system)Electrical workPower supply100–240 V AC, 50/60 Hz, 15 A Install an independent earth leakage breaker on the distribution panel.Shock prevention ... 30 mA ground line must meet D-type ground line requirements.Raise wiring 300 mm from the ■oor surface, and draw a three-core wire out at least 1,000 mm from the tube end.Ensure that PF piping terminals are waterproofed. Ensure that the current running through the wiring is at least 15 A.PF pipingConstruction worksFloor gradientDrainDrainage capacityUse a trap or some other form of odor prevention, and ensure a drainage capacity of at least 100 L/min.Boiler capacityForm an identical ■oor gradient of 1:100 across the area marked with . * Part dimensionsDrainage pit (groove depth of 200 mm or more), install the drain port in the groove.Ensure a boiler capacity of 90,000 kcal/h or more.* Additional consultation is required when using an electric water heater as speci■cations will vary depending on the number of baths taken.Layout diagram/Installation diagramSide-docking typeFront docking typeExample layoutExample layoutLayout exampleLayout example880600740400230At least 12003000880600At least 12007403000500500176Installation exampleInstallation exampleDrain holeDrain holeMultiple drain holes will be required when a single drain hole does not provide su■cient drainage capacityInstallation exampleInstallation example1000400*20001000400*1580650100500650100400400CATALOG No.136CLayout

元のページ  ../index.html#12

このブックを見る