002 tsael t001☆1200 tsael tA051051001516052003494086005308310841epols gnnarD0012☆0053排水配管排水能力100L/minInstallation DiagramLayout exampleInstallation conditions1835-7,Miyoshi,Naka-ku,Okayama-shi,OKAYAMA 703-8261 JAPANKasumigaseki Building 4F, 3-2-5,Kasumigaseki,Chiyoda-ku,TOKYO 100-6004 JAPAN77,Mukoyama,Oku-cho,Setouchi-shi,OKAYAMA 701-4233 JAPANPF pipingHot water / water supply piping (example)(Piping connection requirements)Water cutoff valve20AInstall the water cutoff valve in or near the bathroom (where facility staff can operate it).740At least 1200[Note regarding installation layout]*Recommended dimensions are at least 400 mm.3000AC 220 to 240 V50 / 60 Hz, 15 A, with an independent earth leakage breaker installed on the distribution panel. (Sensitivity current: 30 mA)Ground line must meet D-type requirements.Raise wiring 3000 mm from the floor surface, and draw a three-core wire out at least 1000 mm from the tube end.Ensure that PF piping terminals are waterproofed. Ensure that the current running through the wiring is at least 15 A.Multiple drain holes will be required when a single drain hole does not provide sufficient drainage capacity.Installation works exampleDrain pit / holeDraining perforated plate Head OfficeTokyo Head Office Oku Factory(1545)Installation worksHot water supplyHot water / water supply pressureHot water / water flowHot water temperatureElectrical worksPower supplyConstruction worksFloor gradientDrainage capacityDrainBoiler capacityForm an identical floor gradient of 1:100 or less across the area marked with . (Dimensions marked by ☆)Use a trap or some other form of odor prevention, and ensure a drainage capacity of at least 100 L/min.Drainage pit (groove depth of at least 200 mm). Install the drain hole in the groove.90,000 kcal/h or more.(Additional consultation is required when using an electric water heater as specifications will vary depending on the number of baths taken.)980※※iiS A950(505)Ventilator20 A, stopped by a water shutoff valve. Raised 100 mm from the floor.150 to 300 kPaAt least 30 L/min for each60 to 70°C (endpoint temperature)Mixing temperature control drain (Φ 19 x 26)Main drain (Φ 38 x 48)1500GratingDrain pitDrain holeMultiple drain holes will be required when a single drain hole does not provide sufficient drainage capacity.Bathtub securing plate□100×100980355400100768Hot water supply pipeHot water supplyWater supplyWater supply pipePosition of power supply(AC 220 to 240 V)Tank drain(Φ 19 x 26)Adjuster position(four points)The colors in this brochure may not necessarily be the same as in the actual model due to printing conditions.Speci■cations and appearance are subject to change for improvement without noti■cation.The content of this catalog is current as of October, 2024.CATALOG No, S48_2410_848
元のページ ../index.html#8